—
The decision requested
—
The figures
—
What it changes for the guest
—
The three objections, answered
- “It will feel less premium.” It is the bottle and its finish that carry the perception, not how it was filled — which the guest never sees. A card in the bathroom explaining the product does the rest.
- “The bottles will disappear.” Anti-theft holders exist, for a few euros more per bottle. The decision is taken at the order, not after the first stocktake.
- “The teams will lose time.” The daily laying-out in each room disappears and is replaced by a grouped check. The pilot will measure the real difference rather than estimate it.
What I am not hiding
—
Proposed timetable
- Weeks 1 to 2 — order the equipment and brief the housekeeping team.
- Weeks 3 to 6 — pilot on ten rooms, weekly reading of actual consumption.
- Week 7 — compare the readings against the assumption, decide whether to roll out.
- Weeks 8 to 10 — roll out floor by floor if the pilot confirms it.
—