Comparison grid — 15 checkable criteria
There is no comparison service for hotel guest amenities. Every brand declares itself the most environmentally sound and the highest quality. The only reliable method: ask each of them the same questions, and compare the answers side by side.
No supplier is pre-filled, and that is not an oversight. A grid filled in advance by whoever publishes it is a sales pitch in disguise. This one is empty: you ask the questions, you record the answers, you decide. Nothing you enter is transmitted — it stays in your browser.
| Criterion | Supplier A | Supplier B | Supplier C |
|---|
The grid above is filled in by you, supplier by supplier. Here are the criteria it contains and, for each, what separates a checkable answer from a sales answer.
On checkable facts, not on scores. Place of manufacture, certification and its expiry date, capacities, container material, decoration method, minimum order quantity, quoted lead times, exit terms. Every one of these can be verified — or the supplier declines to answer, which is an answer in itself.
A certification is authenticated with the body that issues it, not on the supplier's brochure. Most publish a public register of certified operators, with expiry dates. That check is what separates a criterion from a claim.
That assumes all three suppliers answer the same questions in the same format, which is the job of the RFP template — its fifteen questions feed the columns above directly.
Record “no answer” and move on. A supplier who states neither their order minimums, nor their lead times, nor their exit terms is telling you precisely what the relationship will be once the contract is signed. The grid counts those cells separately from the score, because they do not say the same thing as a stated “no”.
Because it decides whether you will stay a customer by choice or by constraint. Minimums, committed stock, commitment period, co-branding minimums: no supplier raises them unprompted at the sale, and they are what set your room for manoeuvre in eighteen months.
A stuck-on label in a bathroom eventually lifts in the humidity, and it is the whole bottle that gets replaced. Hot stamping lasts. The criterion looks cosmetic; it drives replacement frequency, and so cost.
Not necessarily, but knowing where the production site is remains the first filter on a supply chain. A supplier producing for dozens of brands does not have the same agility as an integrated manufacturer — nor the same lead-time constraints.
This grid tells you who to choose. The diagnostic tells you whether your current decision holds up, the calculator tells you what it costs, and the switchover plan picks it up once the supplier is chosen.
Fifteen criteria in four families: product, logistics and commitment, commercial, relationship. Each answer is worth 2 points (yes, verified), 1 point (partial) or 0.
Last updated: